A Little Understanding – Above Ground


live4him.ca

A Little Understanding – Bearing the Load

Those pesky engineers are always interfering with my plans. I want everything the way I want it. They want me to get their approval, follow their drawings, something about making sure the floors above the ground are tied into the basement which is in turn tied into the footings. It was so much easier to build the house on the sand. None of this tying stuff into other stuff. No time spent running plans by those who think everything is about point loads and transfer of weight. Just build it and move on…

View original post 926 more words

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Google photo

You are commenting using your Google account. Log Out /  Change )

Twitter picture

You are commenting using your Twitter account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s